This bridge was part of BNSF track expansion project crossing the Cimarron River. The H-Pile was dug down to 18" below grade. Structural steel was sandblasted and coated with two coats of epoxy mastic. All third party inspections were completed by TranSystems Corp. with 100% satisfaction. |
Mid America Painters, Inc. successfully completed Cimarron River Bridge, 2500 linear feet of new construction in Waynoka, Oklahoma. |
High Performance Painting of the exposed portion of piling between bottom of cap to one foot below grade line. The connection bars, pile plates, and the channel bracing received the same coating system. |
26th Ave. Bridge, Amarillo, TX |
Alva OK to Avard OK |